Construction technology of hard polyvinyl chloride UPVC pipe
欄目:Industry News 發布時間:2021-06-03 15:19
In water well engineering, the traditional pipes used to build wells are mainly cast iron pipes, steel pipes and concrete pipes. These pipes have serious corrosion and aging problems, which have been difficult to solve. Compared with traditi...
In water well engineering, the traditional pipes used to build wells are mainly cast iron pipes, steel pipes and concrete pipes. These pipes have serious corrosion and aging problems, which have been difficult to solve. Compared with traditional well pipes, polyvinyl chloride PVC-U pipes have uniform performance, strong corrosion resistance, light weight, abrasion resistance and biological inertness, low water flow resistance, long service life, simple and rapid installation, and low cost And other distinctive features.

1 Well completion process
1.1 Preparation for well completion
(1) Correct the hole depth. After the drilling is completed, the hole depth is corrected, and the steel ruler is used to accurately measure all the drilling tools raised from the hole. The hole depth error shall not be greater than 2.
(2) Test hole. After the hole is drilled, test the hole in time to check whether the diameter of the hole meets the requirements, whether the hole is vertical and round, to ensure the smooth installation of the well pipe and the uniform thickness of the gravel. It is advisable to use a steel hole tester to test holes. The length of the hole tester is 20-30 times the diameter of the hole, and the diameter is 20mm-30mm smaller than the diameter of the hole.
Impact drilling test hole: The hole tester is connected to the end of the drill wire rope, and the hole tester can smoothly go to the bottom of the manhole. Drilling: fL I~P qualified.
Rotary drilling test hole: The hole tester is connected with the drill rod to drill the hole. While running the drilling tool, rotate the drill rod manually, and if it goes down to the bottom of the hole smoothly without any resistance, the drilling meets the requirements. Otherwise, put forward the drill bit to repair the hole until the drilling meets the requirements.
(3) Piping. According to the stratum profile divided by drilling and hydrological logging, the location of the filter pipe and the filling location of different specifications of filter materials are determined, and the actual structure of the well is compiled. The filter tube and filter material should be selected according to the aquifer particle screening data. If the prepared filter tube and filter material specifications do not match the screening data, the filter tube and filter material that meet the requirements should be replaced.
When piping, check the quality of the well pipe, carefully check the fit of the threads, and clean the threads; use a steel ruler to measure the length of each well pipe. And use a marker to number the upper and lower pipes on the well pipe according to the actual well structure drawing.
(4) Drill hole cleaning. Before the well pipe is installed, the hole depth and diameter should be accurately measured, and the hole should be cleaned. The percussion drilling hole is used to draw out the drill cuttings and thick mud that settled at the bottom of the hole with a suction tube. After the rotary drilling hole is tested, the drilling tool should be lowered to the bottom of the hole again, and the mud pump should be activated to flush the cuttings deposited at the bottom of the hole out of the hole, and the mud should be thinned out.
1.2 Well pipe installation
(1) The bottom of the sedimentation tube must be set up at the bottom. The bottom of the tube should be processed with a PVC-U board with a thickness of 20mm~30mm or made of other materials that can ensure the bottom of the seal. The bottom of the tube and the precipitation tube can be connected by plastic welding, epoxy resin bonding, mechanical riveting, etc., but it must be ensured The connection is firm and reliable.
(2) The method of direct lifting and one-off pipe down is adopted. When running down the pipe, the well pipe may float before the water filter pipe enters the water (due to the low pipe density, PVc-u well pipe density: 1.35 ~ 1.45g/cm.) sinking is difficult, you can take the well Water is injected into the pipe to increase its weight and help it sink.
(3) Set up a centralizer. In order to locate the well pipe in the center of the borehole and ensure the uniform thickness of the gravel packing, centralizers must be installed at the appropriate positions of the water filter pipe and the well wall pipe when installing the well pipe. The number of centralizers per well shall not be less than 3 (configured according to the actual well depth). The distance between centralizers is generally 30m~50m, and the diameter of centralizers is 50mm~60mm smaller than the borehole diameter. The centralizer can be made of wood, PVC—U board length should not be less than
600mm, thickness 30mm~50mm. 4 pieces of wood centralizers should be evenly distributed along the circumference of the pipe and tied firmly with iron wires; 3 pieces of UPVC centralizers should be evenly distributed along the circumference of the pipe, which can be bonded by adhesive or tied by iron wires.
Whether it is wire binding or adhesive bonding, it should be ensured that the supporting device is firm and reliable.
(4) The well pipe adopts press-formed thread. When lowering the tube, after twisting the thread to the end by hand, you must use hemp rope and wooden sticks or V-belt and wooden sticks to further tighten it.
(5) The lowering speed in the manhole under the well pipe should be uniform and slow. If you encounter obstacles during the down-pipe process, you should find the cause in time. Solutions such as moving up and down and turning the well pipe slightly clockwise, etc. can be taken, without piercing. If the treatment is invalid, the well pipe should be removed from the hole in time. It is strictly forbidden to knock with metal utensils during the lowering process.
(6) The well pipe must be lowered to the bottom of the hole, and pipe hanging is strictly prohibited. After the well pipe goes down to the bottom of the well, a spirit level should be used to measure the verticality of the well pipe and the levelness of the wellhead, and check the size of the exposed ground as required. When all the requirements are met, fix the well pipe mouth, and use the drilling rig hoist to apply tension to the well pipe (natural hanging state) before enclosing the filter material.
1.3 Gravel filling
(1) Filter material selection. The quality and specifications of the filter material should be carefully checked before gravel filling (the quality and specifications of the filter material shall be implemented in accordance with the relevant technical specifications), and the filter material that does not meet the requirements shall not be filled in the manhole. The filter media containing more soil impurities should be rinsed with water before being used. Measure the number of filter materials stored on site and calculate whether the number of filter materials meets the design requirements. The filter material preparation should be sufficient.
(2) Gravel filling. According to the characteristics of UPVC well pipes, the gravel filling method should adopt the flushing gravel filling method. According to the actual situation of the well site, the pumpless gravel packing method or air compressor reverse circulation flushing gravel packing method can also be adopted. The gravel should be filled continuously and evenly around the well pipe from the wellhead, and should not be filled from a single direction. The filling speed must not be too fast. During the gravel filling process, the position of the filter material surface in N:fL should be checked regularly. If blockage or "bridging" is found, measures should be taken to eliminate the gravel before filling. After the filter material is filled to the predetermined position, the surface of the filter material should be measured again before the water stop or external sealing of the pipe
If there is a sinking position, it should be filled to the predetermined position.
Wash the gravel. After running the pipe, lower the drill pipe from the inside of the pipe to a distance of lm~2m from the bottom of the well pipe, and take measures to close the pipe mouth, and start the water pump to inject water from the drill pipe into the well pipe. The amount of water injection shall be subject to not flushing out the filter material. After the annulus outside the pipe returned water, gravel filling began. During the gravel filling process, the flushing fluid should always be circulated and the pump should not be stopped midway.
No pump to fill gravel. Gravel packing H~: The liquid in fL should always keep overflowing from the well nozzle. If the overflow is interrupted, measures must be taken to refill the gravel until the well pipe mouth resumes overflow.
The air compressor washes the gravel in reverse circulation. The orifice should be connected to the water source when filling gravel. The flushing fluid should always circulate over the hole.
1.4 Waterstop and sealing
(1) Water stop material. Waterstop materials should meet the requirements of relevant regulations, and high-quality clay balls or cement slurry should be used. Generally, high-quality clay balls are preferred for permanent water stop. When a well is formed in a high-pressure artesian zone or there are special requirements for water stopping, cement slurry or colloidal cement slurry should be used for permanent water stopping.
(2) Clay balls stop water. The clay ball is made of high-quality clay, the diameter of the clay ball is 20mm~30mm. Let it cool and dry before use until the surface is slightly dry and the inside is moist and soft. When using clay balls to stop water, the clay balls should be filled continuously and evenly around the well pipe from the wellhead, and should not be filled from a single direction, and the speed of putting the clay balls should not be too fast. During the process of putting the clay ball, the position of the clay sphere in the hole should be detected regularly. If blockage is found, measures should be taken to eliminate it before throwing the clay earth. ’
(3) Cement slurry to stop water. When using cement slurry to stop water, it is advisable to use ordinary Portland cement or aluminum sulfate geological prospecting cement of 32.5Mpa or more. Concentrated quick-drying cement should not be used. In order to prevent the water chemical reaction heat generated by the cement slurry from affecting the UPVC well pipe If the strength is affected, 2-9 bentonite should be added to the cement slurry to eliminate the heat generated by water chemistry.
After the clay ball is filled to the predetermined position, the position of the clay sphere should be measured again before the clay backfilling and sealing outside the pipe. If there is sinking, it should be filled to the predetermined position and backfilled with clay. If you want to check the water stop effect, you can do it before backfilling.
1.5 Well wash
Well washing should be carried out after gravel filling and water-stopping clay is backfilled to the ground level, 24 hours after the procedures are completed. According to the characteristics of UPVC well pipes, sodium pyrophosphate or compressed air should be used for well washing. Pistons can also be used to wash wells.
(1) Sodium pyrophosphate washes wells. Sodium pyrophosphate or sodium hexametaphosphate should be cleaned according to relevant specifications. In order to achieve a good well cleaning effect, before cleaning the well, the mud used for drilling and the mud on the hole wall should be tested indoors, the medicament should be dosed according to the test results, and the well should be pumped and washed regularly.
(2) The compressed air well flushing shall be carried out in accordance with the relevant prescribed procedures. In order to reduce the pressure difference between the inside and outside of the well pipe, the air injection speed should be controlled.
(3) Piston washes well. If a piston is used to clean the well, the following requirements should be met: the diameter of the piston should be 20mm~30mm smaller than the inner diameter of the well tube (the steel platen should be 50mm~60mm smaller than the inner diameter of the well tube), and the length of the piston should be 80mm~100mm. The lifting speed of the piston should not be too fast, and should be controlled between 0.4 and 0.8 m/s. When using steel wire rope weighted drill rods to drive pistons to wash wells, elastic centralizers must be installed on the weighted drill rods to prevent damage to UPVC well pipes. The well is cleaned from top to bottom step by step, and the piston cannot stay in the hole for a long time.

2 Problems and countermeasures in construction
(1) Existing problems. When there is no seat at the bottom of the well during construction, the water level in the pipe will drop after the well is washed, and the mud and filter material outside the well pipe will sink and drive the lower well pipe to sink. The upper well pipe cannot follow the pressure of the backfill at the same time. When sinking, the well pipe is prone to be disconnected, causing waste wells.
(2) Countermeasures. First of all, try to place the well pipe at the bottom of the well. After the well pipe is down to the bottom of the well, the well pipe can be lifted by lm~2m again, and then the well pipe can be quickly dropped to the bottom of the well after aggravating, so that the well pipe can be seated at the bottom of the well several times . In addition, when the well pipe is installed, 4 holes can be drilled at the 1:1 position of the well pipe and anchored with screws, so that no disconnection occurs when the well pipe sinks. After the well is washed, the filter material and the backfill can be solidified. The well maintenance was successful.

Wuxi Jiahong Plastic Technology Co., Ltd. can process various filled, flame-retardant, reinforced modified ABS, PS, PC, PC/ABS, polypropylene, PA and other engineering plastic particles according to customer requirements; various automotive door panels, bumpers, dashboards , Engine cover, car lights and other automotive special materials.

Wuxi Jiahong Plastic Technology Co., Ltd. has nearly 30 years of experience in R&D and pelletizing production of PVC pellets, and experience in R&D and production of modified engineering plastics; the professional technical service team can provide customers with one-stop modified plastic system solutions. If you want to know more about the product, please log in to our official website: m.91jiajiale.cn, consult online customer service or call the hotline. Landline: 0510-68755207 Mobile: 15190220696, we will serve you wholeheartedly.
中日韩免费视频 | 久久天堂| 一区二区三区福利 | 亚洲第一男人天堂 | 三级网站免费观看 | 亚洲欧美精品suv | 内射合集对白在线 | 免费a级大片| 男人天堂视频在线观看 | 黄色一级带 | 黄黄的网站| 日少妇的逼 | 四虎黄色| 少妇熟女高潮流白浆 | 开心激情播播 | av中文字幕一区二区 | 欧美福利视频 | 91免费.| 欧美日韩成人一区 | 你懂的在线网站 | www黄色在线观看 | 精品人妻一区二区三区蜜桃视频 | 欧美最猛性xxxxx(亚洲精品) | 一级视频在线播放 | 日一区二区 | 贝利弗山的秘密在线观看 | av片观看 | 成人av手机在线 | 日韩3级| 91蜜桃麻豆 | 爱色成人网 | 一级免费视频 | 午夜伦伦电影理论片费看 | 超碰98| 国产a线 | 亚洲一级在线 | 久久久xxx | 五月激情综合网 | 蜜桃免费av | 国产成人免费视频 | av成人毛片 | 黑人操日本女人视频 | 青青草视频免费在线观看 | 草莓av | 日本一区二区久久 | 大尺度在线观看 | 亚洲人xxxx | 成人免费短视频 | 亚洲高清一区二区三区 | 9l视频自拍蝌蚪9l视频成人 | 综合激情久久 | 欧美一区二区三区电影 | 精品久久视频 | 成人免费在线视频 | 91精品国产综合久久久久 | 少妇高潮一区二区三区四区 | 亚洲精品欧美 | 国产一级特黄a高潮片 | 精品亚洲一区二区三区 | 久久不雅视频 | 亚洲精品一二三四区 | 福利电影一区二区 | 六月激情 | 亚洲手机av| 精产国品一区二区三区 | 我要看黄色大片 | 男女激情av | 成人激情在线观看 | 伊人影院综合 | 美女隐私无遮挡免费 | 黄av在线| 日韩欧美国产亚洲 | 朴银狐电影中文在线看 | 成人h动漫精品一区二区无码 | 夜夜操夜夜爽 | 不卡在线视频 | 亚洲欧美国产高清va在线播放 | 国产亚洲天堂 | 国产精品制服诱惑 | 国产一区二区三区精品在线观看 | 国产精品一区二区黑人巨大 | 99在线观看视频 | 奇米影音 | 亚洲天天 | 女人又爽又黄免费女仆 | 国产精品久久久精品 | 影音先锋在线视频观看 | 国产精品免费一区 | 高清免费毛片 | 女生被男生c | 伊人亚洲综合 | 啪啪免费网址 | 日本黄色小网站 | 日韩av在线播 | 久草网在线观看 | 自拍偷拍小视频 | 玖玖在线免费视频 | 中文字幕第8页 | 又污又黄的视频 | 久热这里只有 | 尤物一区 | 成人依依网 | 1024国产在线 | 久久久黄色 | 丰满少妇一区 | 成人久久精品 | 久久精品综合视频 | 国产亚洲精 | 91精品国产色综合久久不8 | 人妻熟女一区二区三区app下载 | 亚洲一区免费视频 | 四色网址| 法国空姐在线观看视频 | www.一级片| 亚洲精品电影 | 亚洲综合在线播放 | 手机在线看片日韩 | 国内特级毛片 | 欧洲性xxxx | 国产精品一区二区入口九绯色 | 国产91绿帽单男绿奴 | 国产一级片免费观看 | 99热国内精品 | 男生操女生动漫 | 亚洲精选一区二区三区 | 国产精品欧美综合亚洲 | 国产农村妇女精品一二区 | 亚洲精品在线免费 | 熟妇高潮一区二区三区 | 91网站在线看 | 美女大黄网站 | 男女69视频 | 精品三级视频 | 9999久久久久 | 少妇特殊按摩高潮惨叫无码 | 免费的污网站 | 亚洲色图15p | 亚洲精品乱码久久久久久不卡 | 国产精品图片 | 少妇又紧又色 | 善良的女朋友在线观看 | 国产va视频 | 成人免费黄色大片 | 天天色天天操天天射 | 午夜嘿嘿| 天天干视频在线观看 | 99热这里只有精品首页 | 操三八男人的天堂 | 高潮久久久 | 天天激情| 在线观看亚洲 | 亚洲欧美另类自拍 | 亚洲永久 | 自拍偷拍另类 | 在线少妇 | 亚洲国产果冻传媒av在线观看 | 中文字幕视频 | 免费高清欧美大片在线观看 | 午夜aaa| 色妞色视频一区二区三区四区 | 黄色片大全| 亚洲黄色影院 | 国产乱子伦精品 | 亚洲精品国产成人av在线 | 亚洲视频在线一区 | www.日本黄色 | 精品人妻一区二区三区日产乱码卜 | 国产欧美日韩久久 | 电影图片小说视频在线观看 | 亚洲制服无码 | 伊人网中文字幕 | 久久色在线观看 | 国产成人高清在线 | 久久国产精品一区二区三区 | 99精品福利视频 | 午夜一二三 | 日本熟伦人妇xxxx | 亚洲黄色大片 | 国模无码大尺度一区二区三区 | 国产四区 | av网站免费观看 | 看片日韩| 在线观看亚洲欧美 | 亚洲一区自拍偷拍 | 按摩害羞主妇中文字幕 | 久久久久久爱 | 美女免费网站 | 国产日韩在线播放 | 水果派av解说 | 91精品免费视频 | 久久国产一区二区 | 欧美成人一区二区三区 | 裸体喂奶一级裸片 | 亚洲视频黄色 | 中文字幕资源网 | 一区二区三区中文字幕 | 久久桃色| 亚洲av无码专区在线播放中文 | 一区二区三区四区五区视频 | 熟女丰满老熟女熟妇 | 久久有精品 | 色久天堂 | 欧美丰满艳妇bbwbbw | 男女污污网站 | 成人久久久精品乱码一区二区三区 | 亚洲国产成人av | 清清草免费视频 | 亚洲黄在线观看 | 日韩免费福利视频 | 国产aⅴ一区二区三区 | 日本在线观看一区二区三区 | 成人91| 色天天干 | 六月丁香激情 | 日韩中文字幕高清 | 免费视频成人 | 久久免费福利视频 | 欧洲在线观看 | 男女性网站| 四季av日韩精品一区 | 日本大尺度做爰呻吟舌吻 | 99er久久| 久视频在线观看 | 毛片在线看片 | 久久久少妇 | 日韩经典中文字幕 | 成人深夜网站 | 97av视频| 自拍第1页| 超碰人人射 | 91精品在线观看入口 | 欧美丰满少妇 | 高h全肉污文play带道具 | 日韩av综合网| 国产午夜精品福利视频 | 欧美精品在欧美一区二区少妇 | 一级黄色片免费观看 | 国产黄色片视频 | 天堂va蜜桃| 粉嫩一区二区三区 | 秋霞电影网一区二区 | 手机看片1024国产 | 日韩免费不卡视频 | 成人精品视频99在线观看免费 | 国产aⅴ爽av久久久久成人 | 国产有码视频 | 久久国产精品精品国产色婷婷 | 亚洲欧美另类一区 | 白丝久久| 婷婷色在线视频 | 手机在线观看免费av | 免费欧美一级片 | 欧美性视频网站 | 日韩中文网| 欧美日韩亚洲视频 | 国产福利资源 | 日本视频在线观看 | 精品美女一区二区三区 | 超碰av在线播放 | 色视频在线观看 | 夜色福利视频 | 欧美成人精品激情在线观看 | 亚洲精品乱码久久久久久蜜桃91 | 乱色精品无码一区二区国产盗 | 男人插入女人阴道视频 | 成av人片一区二区三区久久 | 色婷婷香蕉在线一区二区 | 欧美 日韩 中文字幕 | 中文字幕一区二区人妻视频 | 国产美女免费网站 | 无套内谢少妇高潮免费 | 欧美jizz18性欧美 | 超碰97在线免费观看 | 亚洲资源在线观看 | 欧美激情偷拍 | 蜜桃视频一区二区三区 | 亚洲欧美一区二区在线观看 | 狠狠爱综合网 | 亚洲精品久久久久久久久 | 69热在线观看 | 欧洲一级视频 | 免费成人在线观看 | 69成人网 | 清纯唯美激情 | 伊人影院在线视频 | 在线视频一区二区三区 | 欧美人妻一区二区 | 日韩av免费播放 | 色网站在线播放 | 黄污网 | 欧美一级夜夜爽 | 久久午夜免费视频 | 亚洲老妇色熟女老太 | hd丰满圆润的女人hd | 尤物网站在线 | 海角社区在线 | 婷婷91 | 精品人妻一区二区三区日产 | 日韩大片在线观看 | 国产激情av | 91极品身材尤物theporn | 国产一区二区免费看 | 一区二区三区日韩精品 | 麻豆精品视频 | 中文字幕一区二区三区在线不卡 | 日韩首页 | 日韩少妇一区二区 | 调教奶奴 | 91色伦 | 成人在线视频免费看 | 国产女人在线视频 | 午夜性福利 | 精品丰满少妇一区二区三区 | 香蕉视频在线网址 | 日韩av高清无码 | 一卡二卡三卡四卡 | 欧美一级片免费观看 | 日韩永久| 青青青免费视频观看在线 | 日韩三级久久 | 成年免费视频 | 亚洲人成电影在线 | 午夜电影你懂的 | 乳色吐息在线观看 | 性做久久 | 久久艹国产 | 西西午夜 | 久久精品这里有 | www.成人免费视频 | 国产第8页 | 日日夜夜狠狠 | 亚州高清| 三上悠亚在线播放 | 国产精品久久久久久亚洲影视 | 免费国产高清 | 东北少妇bbbb搡bbb搡 | 亚洲久久久 | aa片在线观看视频在线播放 | 久久久久亚洲av无码网站 | 精品五月天 |